Commercial dashboard
Recent projects
Site workflow
Open a project, record measurements, notes and photographs, then synchronise when a connection is available.
Project register
Project editor
Materials
Your materials
Rates are yours. Nothing here is shared with another firm.| Code | Description | Category | Unit | Rate | Waste % | Priced from |
|---|
Plant & access
Plant and access
| Code | Description | Category | Unit | Rate |
|---|
Labour
Hourly rates drive the labour lines on an estimate.| Role | Description | Hourly rate | Per 8 hour day |
|---|
Site capture
Device sync
Sync activity
How offline mode works
When you are online, saving sends your changes straight to the server, so there is nothing for you to do here. When you are not, the change is kept on this device and sent as soon as a connection returns. Conflicts are never silently overwritten, so a change made on two devices is reported rather than one quietly winning.
Measured on this project
Nothing captured yetEach wall can be priced straight into the estimate. Choose a build-up and R77 works out the boards, studs, track, insulation, screws, tape, compound and sealant, rounded up to whole units the way you actually order them.
Site diary
Record a day
Kept on this device and synced with the project.This project
Nothing recorded yetA dated record of who was on site and what stopped them is what a delay claim or a variation argument is decided on months later.
What to order
Order schedule
Built from the estimate you priced, not typed again.Quantities include the waste allowance that was priced into the estimate, because that is the quantity that actually has to arrive on site. The estimate is what you were paid for; this is what you have to buy.
| Item | Description | Priced qty | Waste % | Order qty | Unit | Rate | Order value |
|---|
Documents
Produce a document
Documents are produced by the same engine the desktop edition uses, from the estimate as it is currently saved. Save your changes first.
Produced documents
Sketch a take-off
Set out
One grid square is one metre.Tap to drop a point, and each leg is labelled with its length. A run finished here becomes a measured wall in R77 Measure, which prices it against a build-up. The sketch geometry travels with it, so the quantity can be checked against the drawing it came from.
Your firm
Customers
| Company | Contact | Phone | Status |
|---|
This installation
Where the job is
Against the tender
From the approved calculation, not a second opinion.What you invoice, and what is held
Payment stages
CIS is deducted from the labour element only, never from materials. The labour on this estimate is £0.00. These are arithmetic, not tax advice: check the treatment of any job with your accountant before you invoice it.
| Stage | % | Net | VAT | Retention | Due |
|---|
User and device
Your details
Signing in
There is no password on this account. You sign in by entering your email address and the six-digit code we send to it. The code works once and expires after ten minutes, so there is nothing to remember, nothing to reuse, and nothing worth stealing.
Changing the email address above changes where that code is sent, so make sure it is an inbox you can still reach before you save it.
Application status
Foundation status
This is a Phase 3C.1 development preview. It is suitable for controlled pilot testing, not public internet deployment or live customer data until hosting, penetration testing, backups, privacy controls and production approval are complete.